    Rehabilitation and repair of reservoir R3 in the warehouse of Ps1 in the field of Rumaila North at a total cost of (430 million) four hundred and thirty million Iraqi dinars / Ministry of Industry and Minerals Oqba bin Nafi public in 2009

  • 2

    Construction of the first floor above the oil building of Basra Refinery Company (SRC) at a total cost of (287,168,000) two hundred eighty-seven thousand hundred and sixty eight thousand Iraqi dinars, where the beneficiary Refineries Company.

  • 3

    Construction of the two stations (MCC) in the refinery of Dhi Qar at a total cost of (546,178,000) five hundred and forty-four one was the South one hundred and thousand million and seventy-eight dinars, where the beneficiary is the company Dhi Qar refinery.

  • 4

    paving the way of the Iraqi residential role in the refinery of Dhi Qar at (129,500,000) one hundred and. twenty-nine million five hundred thousand Iraqi dinars was also the beneficiary of the project South Refineries Company.

  • 5

    Construction of the Engineering Inspection and Environment Section at the South Refineries Company (SRC) where the total value of this project was 822,655,000 eight hundred and twenty-two million six hundred and fifty-five thousand Iraqi dinars, where the beneficiary was the South Refineries Company.

  • 6

    Construction of the mass transport building in the South Refineries Company with a total value of 79,546,000 Dinars and seventy-seven million five hundred and forty-six Iraqi Dinars. The beneficiary is also the South Refineries Company.

  • 7

    Tiling the internal streets inside the Shuaiba refinery with a value of 732,560,000 seven hundred and thirty-two million five hundred and sixty Iraqi dinars.

  • 8

    Construction of a healthy group for the procurement department of the South Refineries Company. The total cost of this project was 92,500,000 ninety-two million thousand Iraqi dinars.

  • 9

    Construction of a room and a sanitary group for the warehouse department in the South Refineries Company with a total value of 79,383,000 three hundred and eighty-three thousand Iraqi dinars

  • 10

    Sub-Contract for the construction of CU 100 & CU200 buildings in CDU4 of the South Refineries Company where the total financial value of this project is (2,246,067 $) where the work includes all civil activities of the two buildings including concrete structures, brickworks and finishing works and the installation of a HVAC systems (indoor and outdoor units) in cooperation with DAIKEN Co. and all electrical works and trans formers and condensate units’ erection. The work was supervised by TECHNO.EXPORT in South Refineries Company.

  • 11

    PU005 Contract The contract includes laying and welding of pipes the international according to specifications AMAS 31.3 for the Pipeline in the Shuaiba Refinery of the South Refinery Company (SRC) where the works are summarized in the installation and welding of multi-diagonal pipes and types, as installation jo sandblasting and sanding and dyeing pipes with special dyes. Insulation as well as connecting the work of ST the connecting pumps and valves of different sizes and measurements in addition to conducting inspections such as hydrotest and NDT and RI etc., and then the process of re-linking also the installation and installation of steel structure which the high pipes and according to the platforms T Global. As these pipes are transporting all types of liquids and gases and bear high combines the mechanical and civil pressure. This contract the civil works are works, as summarized as the work of the crossings for concrete pipes and sleepers etc. The total value of this project was 4,980,000 $. The project supervisor was the Czech company Techno Export and the beneficiary of this project is the South Refineries Company.

  • 12

    PU002 & 003 Contract The contract includes laying and welding of pipes according specifications AMAS 31.3 for the Pipeline in Basra Refinery in South Refinery Company (SRC) where the works the to international are summarized in the installation and welding of multi- diagonal pipes and types, as well as the installation of sandblasting and sanding and dyeing pipes with special dyes. Insulation as well as connecting the work of connecting pumps and valves of different sizes and measurements in addition to conducting inspections such as hydrotest and NDT and RT etc., and then the process of re-linking also the installation and installation of steel structure on which the high pipes and according to the platforms T Global As these pipes are transporting all types of liquids and gases and bear high pressure. This contract combines the mechanical and civil works, as the civil works are summarized as the work of the crossings for concrete pipes and sleepers etc. The total value of this project 3,890,000 S. The project supervisor was the Czech company Techno Export and the beneficiary of this project is the South Refineries Company.

  • 13

    Contarct for electrical part PU-001 & PU-002 and general, which includes the electrical works in thefourth refining unit in terms ofinstalling electrical stations,electrical transformers and controlpanels in addition to the centralcooling equipment in the buildings of the fourth refining unit where inaddition to the lighting fixture inthe streets of Basra refinery, Thecontract with Techno Export andthe beneficiary is the South Refineries Company.

  • 14

    contract with Techno Export Company to supply Sub-base thetype of B-type Spice, in addition toits brushes and its substitutes in theSouth Refineries Company, wherethe value of the quantity suppliedby our company is about 171.000m3, and our company is approvedby the South Refineries Companyand Techno Export Company byprocessing such materials and allkinds.

  • 15

    Contract CU-005 with Techno Export Company, where thecontract includes works of concrete slabs(sleepers), concrete pillars that are under the pipes,drilling and burial at the work siteand the work of ferries through which the pipes extend to the otherside as well as the installation ofsteel structures in addition to thework of the wooden mold and theprocessing of iron and all the work required in addition to dye the steel structures with three layers of dyeand according to international specification.